Charge session

KDB 192P · 19 Sept 2026, 16:46

CompletedDC fast

CHJ-DEV-00A2-1789825576-200

KDB 192P · CHJ-PK-0042 · CHAJI Industrial Area

Energy
2.457 kWh
Duration
56m
Peak power
3.15 kW

Session details

Start time
19 Sept 2026, 16:46
Finish time
19 Sept 2026, 17:42
Initial meter
731.277 kWh
Final meter
733.727 kWh
Charge
20% → 93%
Pack voltage
66.681.9 V
Meter source
Charger meter
End reason
Charge complete
Battery
CHJ-PK-0042
Device
CHJ-DEV-00A2
Session duration
56m

At a glance

Charge

Energy delivered

Peak power

Average power

Hottest reading

Energy consumed

Final meter

733.727 kWh

Initial meter

731.277 kWh

Energy consumed

2.450kWh

Meters agreeDevice-integrated energy 2.457 kWh, within ±0.02 kWh to bill as-is.

Meter values

Voltage, current, power, energy, state of charge and temperature during session CHJ-DEV-00A2-1789825576-200